|
Inservice Inspection requirements for Class 1, 2, and 3 systems, components, and supports
Nondestructive examination
Inspection plans and schedules
Application of Code Cases
Acceptance criteria and corrective measures
Evaluation of plant operating events not specifically included in Design Specifications (nonanticipated events, such as water hammer, overpressurization, or new loads)
Applicability of Section XI to repair, replacement, modification, and maintenance activities
Alternative requirements for small items
Preparation and content of Repair/Replacement Programs and Plans
Verification of acceptability
Application of Section XI, Construction Code and Code Cases to repair, replacement, and modification activities
Application of B31.1 and Section II, III, and VIII rules to Section XI repair, replacement, and modification, including quality assurance, materials, design, welding, heat treatment, examination, and testing requirements
Design Specifications and Design Reports
Procurement of replacements; reconciliation of later Editions and Addenda of the Construction Code
Defect removal, welding, and special processes
Weld overlays and alternative configurations
Installation, examination, and pressure testing
Leakage evaluation and acceptance criteria
Documentation
Impact of Section XI Code Interpretations regarding repair, replacement, and modification
Relationship of 10CFR50.55a, NRC Bulletins, and NRC Generic Letters 89-09 and 90-05 to repair, replacement, and modification
|