Order #: U00011 There is a newer edition of this document available.
ISBN #: 079183073X Published: 2007
Product Type: Print-Book
This Section contains Division 1 and 3, in one volume and provides rules for the examination, inservice testing and inspection, and repair and replacement of components and systems in light water cooled and liquid metal cooled nuclear power plants. The Division 2 rules for inspection and testing of components of gas cooled nuclear power plants have been deleted in the 1995 Edition. With the decommissioning of the only gas cooled reactor to which these rules apply, there is no apparent need to continue publication of Division 2. Application of this Section of the Code begins when the requirements of the Construction Code have been satisfied. The rules of this Section constitute requirements to maintain the nuclear power plant while in operation and to return the plant to service, following plant outages, and repair or replacement activities. The rules require a mandatory program of scheduled examinations, testing, and inspections to evidence adequate safety. The method of nondestructive examination to be used and flaw size characterization are also contained within this Section.
This publication is issued with an automatic addenda service. All addenda service publications are issued in loose leaf format to facilitate later insertion of replacement pages which incorporate the latest approved changes to the standard. Purchasers may wish to purchase a binder from ASME (BPVC Binder), but the publication will also fit a standard three ring binder. Details on the specifics of the addenda service are as follows:
Addenda Schedule: Yearly Next Edition: 3 years Interpretations: With Addenda
Table of Contents
|
|